project gallery

USPS Server Room Consolidation
The work included, Demolition, Finishes, Masonry, HVAC, Fire Suppression, Plumbing, Electrical, Fire Alarm, Building Automation System (BAS), Low Voltage Communications, Enterprise Physical Access Control System,
Ross & Lucas ICF-MR Group Homes
This project is for the construction of two (2) adjacent Intermediate Care Facilities (ICF-MR) in Spotsylvania County. The work will include, but not limited to:
Design/Build BEA Headquarters Relocation
The scope of work will provide design/build services for the renovation and new construction in an 110,000 SF space over three floors at the Suitland
Design/Build EPA Two Potomac Yard Relocation
The scope of work will provide design/build services for the renovation and new construction of approximately 19,600 SF for EPA on the basement level of
Rebuild Travel Lift Pier at USCG Base Portsmouth
Construction of new cast in place haul out piers (two), complete with handrails, guard angle, ladders and fendering system, Removal of north and south haul
Renovation of Building 1442
Building 1442 is the home of the Department of Public Works (DPW) for Fort Belvoir DPW. The work shall include, but not be limited to
New MSSL Facility at the US Coast Guard Base in Elizabeth City, NC
QSSI was recently awarded the New MSSL Facility at the U.S. Coast Guard Base in Elizabeth City, NC for Building 77, Building 80 and Building
Construct New Shoppette/Gas/Burger King
The project consists of an approximately 7,200 square foot Class Six Shoppette. The Shoppette facility will include: retail space, Burger King dining room and kitchen;
Various Asphalt Road Repavement at Fort Meade, MD
Asphalt Phase I includes Reece Road Gate House, Reece Road to Cooper, Cooper at Rockenbach, repavement of Simmonds Road, Ruffner Road, Reece Road, commissary parking
Various Projects at Fort George Meade, MD FGMM
QSS International Inc will be required to perform a broad range of maintenance, construction, repair and alteration of various facilities, minor construction and real property
Design/Build Building 216 Renovations
The project is approximately 24,400 sf in total – it includes work on all three floors. On the first and second floors, it configures the
Replace Gas Weld System at USCG Yard Baltimore, MD
The works includes replacing existing underground and above ground Oxygen and Propylene gas distribution lines in the entire industrial area to include all piers, waterfront
Exterior Security Upgrades U.S. DOJ Headquarters
The project consists of installation of numerous security features at two vehicular entrances to the building. The project will be implemented in two phases in
Mason Neck Visitor Center Expansion
The project is generally described as a 1,143 sf addition to an existing 2,909 single story wood frame building with approximately 500 sf of renovations
Main Exchange Store Image Upgrade in Fort Myer, VA
The project consists of an addition to and remodeling of a Main Exchange Shopping Center Complex through phased construction. The completed facility will include a
Install Air Compressor and Air Dryers
The purpose of this project is to (1) Repair existing gas fired, water cooled air compressor in Building #15, (2) Replace existing electric motors in
Design/Build Parking Lot 1900 & 3100
Purpose of this project is to design and construct pavement repairs and parking lot expansions at buildings 1900 and 3100 complete and ready for use.
Main Store Image Upgrade at Main Exchange in Fort Lee, VA
The project involves the renovation of the existing 125,000 Square Foot Main Exchange building located at Fort Lee, VA. The work includes Selective Demolition, Concrete
North Post Shoppette
This project replaces existing interior finishes, doors, lights, and equipment in the approximately 10,000 Sq of the Class Six Shoppette at Fort Belvoir, VA. Work
Cooling Tower Replacement at Building 6500
The project consists of removal of (3) 300-Ton existing cooling towers. Install Three (3) new 300-Ton cooling towers which will be raised 4 feet on
Wedgewood Suite K Phase II Renovation
The project renovates the remaining space in the Wedgewood Suite ‘K’ Repository to maximize the freezer expansion. This renovation will include the installation of utilities
Renovation of EPA West Room 4122
The work includes, but not limited to: Demolition of walls, ceiling, carpet etc. Relocate/install new doors & frames, hardware. Provide new doors and hardware as
Quantico Outdoor Washrack
The work includes, but is not be limited to the following: Demolish 4 existing outdoor shower systems and replace with 3 new shower systems that
Exterior Improvements at USCH
FAA Building Caulking & Sealing
QSS International Inc, recently completed the Caulking and Sealing of the 44,000 Sq ft Garage at the FAA Building in downtown DC for General Services
NVCC Math Emporium
The project is generally described as renovation of five (5) classrooms in the existing CT building. The rooms to be renovated 114, 121, 122, 125,
Activate Einstien Bagel and Subway
The work involved tenant fit-out of an Einstein Bros Bagel, Subway and 40 seats dinning area, a Book Store which includes Snack Avenue and reach-in-coolers,
ALMC Food Concept Renovation
This project renovated the ALMC Food Concept Kitchen (back of house, serving, and dining area), expanding dining area into adjacent interior space and the construction